How Much Overlap On Metal Roofing
When laying the metal panels on the roof the overlap ridge of the new panel should straddle the underlap ridge of the panel before it.
How much overlap on metal roofing. Overlapping anti condensation lined sheets. Be sure the larger edge is laid so that the small edge of the next panel will overlap it. How to overlap metal roofing. If you re installing a metal roof on a home without gutters you can overhang the panels by twice that amount.
Once the first sheet is in place you need to install the remainder of the lowest row of corrugated metal roofing. Learn how much to overlap the corrugated sheeting. Install metal panels or shingles align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line. As a first line of defense against water damage it is important that the metal roof overlap be implemented correctly.
Install the roofing screws vertically along each rib in the panel. Secure the sheets into place with screws. Installing corrugated metal roofing will require you to lap the m. Apply side lap sealant if the pitch of your roof is 2 12 or less.
Any end laps must be supported by a suitable purlin. If end laps are required you should allow 300mm minimum overlap sealed with butyl sealant tape 10mm from the edge of each overlapping sheet as well as in the middle of the overlap. On the eave side of the roof aim to overhang the panels by 1 to 1 5 inches. The panels overlap allowing water to flow from one panel to the next without being able to penetrate the area under the roofing panel.