How To Install A Hardwood Floor Over Plywood
The key to a beautiful long lasting hardwood or laminate floor is a well prepared subfloor.
How to install a hardwood floor over plywood. Use wood or drywall screws to attach the substrate to the floor joists. New hardwood flooring over old hardwood flooring. If you are working atop a single plywood layer we recommend adding a second layer of 1 4 to 1 2 inch plywood or commercial floor substrate material. Installing hardwood floor 155149312 57e967d45f9b586c35ade84a via.
If the hardwood flooring is installed nailed down parallel to the direction of the old wood flooring the new wood floors could pull apart leaving open gaps or develop waviness later if the old wood flooring under it expands or contracts. This flooring can be installed over old wood flooring or over a plywood sub floor. Do this by multiplying the room s length by its width. How to properly install your hardwood flooring using our gaylord hardwood flooring installation guidelines.
Made from layers of real wood compressed together engineered hardwood floors are better able to handle changes in moisture and humidity than solid hardwood. Can a foam pad be use under solid hardwood flooring description. A minimum 3 4 inch thick sub floor is required. Before you install your plywood subfloor first calculate the room s square footage to find out how much flooring you ll need to buy.
We will walk you through every step of our instal. Replace any nails with screws since nails that popped up will loosen again. If the subfloor is plywood or particle board start by screwing down any loose boards or plywood sheets. If you ve decided to install engineered hardwoods there are four possible installation methods depending on the subfloor.
Add more wood screws if needed to secure them.