How To Install A Zurn Z 1400 Floor Cleanout
The z1400 bz level trol adjustable floor cleanout is engineered to reduce installation and rework time with the cover being adjustable after final pour.
How to install a zurn z 1400 floor cleanout. Products building drainage cleanouts cleanouts z1400 bz1 z1400 bz1 zurn z1400 bz1 dura coated cast iron body with ez1 post pour technology is engineered to simplify product installation. Comes standard with gas and watertight abs tapered thread plug and round scoriated cast iron light duty secured top comes in polished bronze zb nickel bronze zn and stainless steel zs top options with additional leveling adjustment to. Zurn z1400 level trol adjustable floor cleanout dura coated cast iron body with gas and watertight abs tapered thread plug and round scoriated cast iron extra heavy duty secured top specify finish z zb zn zs adjustable to finished floor. Zurn adjustable floor cleanout with flashing flange.
Flashing to the anchor flange will reduce installation and rework time. The z1400 sz level trol adjustable floor cleanout is engineered to reduce installation and rework time with the cover being adjustable after final pour. Comes standard with gas and watertight abs tapered thread plug and round scoriated cast iron heavy duty secured top comes in polished bronze zb nickel bronze zn and stainless. Comes standard with gas and watertight abs tapered thread plug and round scoriated cast iron light duty secured top comes in polished bronze zb nickel bronze zn and stainless steel zs top options with additional leveling adjustment to.
Comes standard with gas and watertight abs tapered thread plug and square scoriated cast iron light duty secured top comes in polished bronze zb nickel bronze zn and stainless steel zs top options with additional leveling adjustment to. Features and benefits integrated engineering that includes post pour adjustment and tilt accessory package ships as a complete and assembled system saves over 14 minutes per drain installation. The z1400 bz level trol adjustable floor cleanout is engineered to reduce installation and rework time with the cover being adjustable after final pour. Adjustable floor cleanout with flashing flange 4 threaded.
The z1400 k level trol adjustable floor cleanout with anchor flange is engineered to be utilized in a water proofing membrane application. Zurn deck cleanout nickel bronze with polished scoriated top.