How To Install Laminate Flooring For Dummies
This will allow them to acclimate to the room s temperature and humidity.
How to install laminate flooring for dummies. Doing so enables you to slide the new planks underneath the casing. They should acclimate for at least 48 hours. This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity. Fill any low spots in the underlayment greater than 3 8 inch with floor leveling compound.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels. You put the tongue of the piece of laminate into the groove and tap the other side of the block with a hammer thereby applying force without mangling the tongue. Lay out the unopened boxes of laminate planks in the room. If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
Place unopened packages of laminate flooring in the room or rooms in which they are to be installed. In this video i am showing how to install laminate flooring for the first time. Moisture can often destroy a perfect laminate floor installation so before you begin it is very.