Be careful if you re spreading enough mortar for more than one tile because you don t want the mortar to dry out.
How to install slate flooring on concrete. Cement board sheets installed on the subfloors protects the lower surfaces of the floor. Trace that tile template onto the floor remove the template and snap a red chalk line on each axis of the traced template. Once the first row of slate tiles reaches the wall you will often end up with a gap. The only difference is whether your walkway is an existing concrete or brick installation in which case you install the slate like regular ceramic tile using thinset mortar and grout.
You can install slate tile flooring yourself by laying the tile with mortar and grouting it. While it is an investment it is long lasting and easy to clean. The older flooring will need. Step 1 preparation.
Create a four tile template starting at that first tile. Use spacers between the tiles. The subfloor must be clean and smooth before installing the slate tiles over it. Installing slate tile over a concrete base.
How to install slate tile over concrete step 1. Step 4 install the tiles. Preparation of the subfloor. In this 3rd part i show how i used slate tiles to finish the job.
Spread the thinset over the concrete with a. Lay the first plank appropriately spaced from the wall. Laying the outdoor slate tile. Continue in this manner for the remainder of the row trimming the last plank as needed.
Then employ a wet saw to cut a tile down to the dimensions necessary to fill that area in. Space it out with 1 8 inch spacers. Measure the distance from the tile spacer on the last piece to the end of the room. Mix a batch of thinset such as flexbond in a 5 gallon bucket.
Step 2 level the floor. Procedure to install slate tiles 1. Before starting with the installation you should remove all possible flooring and coverings. Check the concrete surface to check if it is level using either a 4 foot or an 8 foot level.
Step 3 use thinset. Step 5 use the grout. Then use a damp sponge to wet each tile before you lay it on the mortar. Set the tile.
Spread enough mortar for one or two tiles at a time. The grid that you re creating will be the guideline for setting the field tile. When ready place the specially sized piece into the space to complete your first line. If it is not.