How To Lay Engineered Oak Flooring On Concrete
Here s a step by step guide to help a diy enthusiast install an engineered wood floor over a concrete base.
How to lay engineered oak flooring on concrete. You need to leave a 5 16 inch gap between the flooring and the baseboard or wall around the perimeter of the room to allow the floor enough space to expand. Engineered floors are common in 3 types of construction. If the concrete floor fails in the test certain provision must be provided to correct the moisture penetration problem or else the plan for wooden flooring has to be dropped. The tests mentioned below are the ones recommended by the oak flooring institute of national oak flooring manufactures association.
The maximum length that we recommend engineered wood flooring can be installed is 7m in any direction. The planks glue together to create a floor that floats moves freely as a unit. Treated plywood to the concrete with concrete screws spaced every 16 in. The floating floor method simply involves laying your engineered oak boards without any direct fixing to the sub floor.
Once you ve fitted your underlay you can start laying laminate on concrete. Oak walnut by finish oiled lacquered. Laying laminate flooring on concrete. If you do intend to install engineered wood flooring in a longer run look for areas where you can add expansion gaps such as doorways.
The engineered oak flooring must be suitable for the task so normally 20 mm thick and the joists should be spaced no wider than. If in doubt add an extra pack to allow for any mishaps. Glue down as an installation method for engineered wood floors as the name suggests involves using a bonding agent adhesive or glue that you put directly on to your concrete subfloor before laying your floor. First you need to do a moisture vapour transmission rate test.
Treat it with the respect it deserves. Lay the 1x4s perpendicular to the direction you intend to install the floor planks. Laying an engineered floor over concrete. Engineered oak boards as a structural floor in this situation the engineered oak boards are fixed by secret nailing see below them to your timber joists to form a new floor or to replace existing floor boards.
This test will determine the moisture levels of the slab. For this the floor quite literally floats over the top of the concrete with the tongue and grooves glued together. Alternatively screw rows of treated 1x4s to the concrete 16 in. Then nail the flooring planks with a standard flooring nailer see photo for details.
Installing an engineered wood floor is a major project. What are the best engineered hardwood floors to lay over your concrete slab. If you choose this method of fitting you need to make sure that there s no dampness whatsoever in your subfloor. Engineered flooring goes down over a thin foam sheet which provides cushioning and sound dampening.