How To Lay Laminate Flooring Uk
This will stagger the seams which results in a more natural look.
How to lay laminate flooring uk. If it s not start the row with a plank cut to a length greater than 1 foot. Cut a 16 mm gap around pipes. In this video i am showing how to install laminate flooring for the first time. Use the remainder of the laminate flooring planks you cut at the end of row one to start the next row as long as it s longer than 1 foot.
Prepare the floor and lay a combined underlay and dpm if necessary. Start the second row where you started off the first. Place unopened packages of laminate flooring in the room or rooms in which they are to be installed. Laying laminate flooring is quick and easy and it can be fitted into most areas of any home usually with the exception of wet rooms.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels. This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity. Underlay can also be put down to help beneath a wooden floor which is typically less than 5 per square metre while a damp proof membrane which can be laid over a concrete sub floor is usually only around 20 for an average room. Step 1 let the boards acclimate.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very. Floating using an underlay is the most common method as it can then be fitted over any type of sub floor. This is the thinnest type of underlay used under laminate flooring and is good for any firm dry and level sub floor such as chipboard plywood or hardboard.