How To Lay Timber Flooring On Concrete
Flooring usually takes three to five days to acclimate but the real test of acclimation is when its moisture content as measured by a meter has fallen to within 4 percent of that of the subfloor.
How to lay timber flooring on concrete. Here are some of our tips for preparing concrete before laying your hardwood timber floor. Unpack the flooring and spread it around the room to acclimate. Lay the 1x4s perpendicular to the direction you intend to install the floor planks. Whether you re planning on renting out your home or looking to increase its value using concrete as a base is a great idea.
You don t want be trapped in a corner and have to walk on the newly installed floors. Unlike the moisture barrier you do not want the edges to overlap unless they come with a built in adhesive strip. Cut pieces as you go. Alternatively screw rows of treated 1x4s to the concrete 16 in.
Lay down a moisture barrier. Treated plywood to the concrete with concrete screws spaced every 16 in. By eliminating the paint it ensures that the adhesive is going to stick to your concrete. Moisture can ruin your flooring before you even install it so avoid bringing the flooring into the installation space until the concrete is dry.
Lay the floor parallel to longest wall in the room. Install a underlayment on concrete floor in basement over the moisture barrier to help soundproof your floor. If you are using an old floor and it has previous paint you ll have no other option but to remove it. Always have an exit plan when laying out the floor.
Normal room temperature and humidity conditions must be maintained for the entire. Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.