How To Level Basement Bathroom Floor
Step 4 mix and pour the self leveling material.
How to level basement bathroom floor. Lay a long level downhill on the floor with one end of the level on the level part of the floor and the other end at the lowest point. Use expansion tape to lay a perimeter around the basement floor. Then mix a self leveling agent with water in a large bucket and pour it over the surface of the floor. Watch our video to see how to mix nxt and why leveling a basement bathroom is so important.
From there the pipe runs under the floor and out to the city sewage system under the street. In this video we show you everything you need to know how to level a floor into a perfect flat and level floor in your bathroom using self leveling floor com. Happily enough leveling uneven concrete slabs has an easy fix that won t sacrifice your headroom. Use a squeegee or trowel to spread the self leveling agent around until the whole floor is covered.
First locate the main stack the large 3 or 4 in. This tape is helpful both at leveling the compound in the next step and at strengthening the new surface of the floor. With small tiles the maximum differential between the lowest and highest point on the floor is 1 4 inch per 10 feet. With larger tiles the acceptable differential is a mere 1 8 inch per 10 feet.
To level a basement floor start by removing any furniture and appliances on it and then thoroughly cleaning it. Raise the lower end of the level until the bubble is centered then measure the distance from the bottom of the level to the floor to find the depth of the dip. A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too. You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
The tape should lie at the edges of the concrete floor where the ground meets the wall at a right angle. Add enough nxt to cover the floor screw indicators. On the top side of the floor another fix it idea to lay down new hardwood over the existing floor. Six bags of nxt were required for this basement bathroom and a floor squeegee was used to spread it evenly.
Diameter vertical pipe that runs into the basement floor. Look for a cleanout plug along the street facing wall of the basement. The easiest way is to use a self leveling compound also called liquid floor underlayment or floor resurfacer within sections of level cut rails. But it may run at an angle rather than straight out to the street.