How To Level Concrete Floor To Install Laminate
Once you ve leveled your floor you can install the laminate pad.
How to level concrete floor to install laminate. For a successful installation the concrete floor beneath the tile needs to be. Apply concrete leveler primer to the floor with a soft bristle push broom. To prepare the foundation concrete floor for laying laminate you will need. Make sure to smooth out any puddles of primer to end up with an even coat.
Then use self leveling compound to fill in any low spots. Wait for the compound to dry prior to laminate installation. A container for solution. Floors are rarely perfectly level.
Then place the pad and get ready to install your laminate flooring. A plastic roller with spikes. To determine the roughness of the concrete floor we put a direct rail to the floor and a level is determined at any not very smooth place. Check your wood flooring manufacturer s recommendations and sand any high spots with a concrete grinder.
Leveling a concrete floor for tile. There will probably be more than one. If you want to install vinyl tile or ceramic tile things get a bit trickier. Rent a concrete grinder to grind down the lumps after you use a 6 level to identify them.
If you re on a concrete subfloor you will need to lay down a moisture barrier before applying the pad. After vacuuming or sweeping the subfloor to clean it add a plywood layer if the subfloor is in very bad shape but do not overlap the sheets. To level a subfloor for installing laminate follow the directions above to remove high and low spots. Feather the edges so they blend in with the surrounding floor.
Remember to pin down the barrier to keep it from shifting around. Use a long level and tape measure to check that the floor is level. After installing the moisture barrier select the thickest pad you can get to help level out the floor even more. If the floor is uneven lift up the board until it is level so you ll know how much flooring compound you ll need to even it out.
Apply floor leveling compound to any low areas or dips using a trowel. Typically the floor must be level and uniform within 3 16 inch every 10 feet.